Tuesday, May 26, 2009

Work Party with Zeta Psi from the UW


Last Saturday we worked for 3 hours hauling about 3 cubic yards of gravel up the trail. The gravel (kindly provided by the Parks Dept) was really heavy. Since the trip in from the trailhead is uphill, it was pretty exhausting. Eric spread some of the gravel and dug a couple of trenches to divert water from the trail.

We still have another 5 cubic yards of gravel to distribute. We'll use some at the trailhead.

Thanks very much to the UW Zeta Psi fraternity for their hard work!


No comments:

Post a Comment